# Auswertung VDM

Breadcrumb: [Bids](https://bidrover.com/bids) › [Germany](https://bidrover.com/bids/country/germany) › [Architecture & Engineering](https://bidrover.com/bids/country/germany/architecture-and-engineering)

Status: Open

- Deadline: Due Nov 20, 2026
- Posted: Oct 23, 2026
- Region: Germany
- Category: Architecture & engineering
- Documents: Listing only

## Summary

Auswertung VDM is an open public bid opportunity in the architecture & engineering category for Germany. It was posted on Oct 23, 2026 and closes on Nov 20, 2026 (27 days from today).

## Similar open bids

- [BPol Blumberg](https://bidrover.com/bids/bpol-blumberg--b60a1e85-eee5-45ca-8e28-b8ee305fe25c) — Architecture & engineering · Germany · No deadline listed
- [Interessenbekundungsverfahren; Planung, Finanzierung, Installation und Inbetriebnahme eines Teilabschnittes des Ableiters 1 der Abwasserbehandlungsanlage I (ABA I) im Industriepark Schwarze Pumpe](https://bidrover.com/bids/interessenbekundungsverfahren-planung-finanzierung-installation-und-inbetriebnah--ce33b99e-ca32-4adf-a58f-813635c06830) — Architecture & engineering · Germany · No deadline listed
- [RV Elektro-Prüfungen Ffo](https://bidrover.com/bids/rv-elektro-prufungen-ffo--8965fc50-5764-4a8b-85e9-a862bcacc4c3) — Architecture & engineering · Germany · Due Nov 19, 2026
- [RV Elektro-Prüfungen Ebw](https://bidrover.com/bids/rv-elektro-prufungen-ebw--3f51bcda-b158-4b24-ae87-c5f56ec4e3f6) — Architecture & engineering · Germany · Due Nov 19, 2026
- [RV Elektro-Prüfungen Sfb](https://bidrover.com/bids/rv-elektro-prufungen-sfb--89741857-af23-44fa-b4c8-44adac0b6b79) — Architecture & engineering · Germany · Due Nov 19, 2026
- [RV Elektro-Prüfungen Cbs](https://bidrover.com/bids/rv-elektro-prufungen-cbs--dfa01b92-106d-4faa-8d5c-efcf870e0266) — Architecture & engineering · Germany · Due Nov 19, 2026

Canonical page: https://bidrover.com/bids/auswertung-vdm--e080957c-b46b-4657-bcb1-1ab701b22c44

---

BidRover lists bids from official public sources. It is not an issuing authority; confirm requirements, amendments and submission instructions in the official notice before responding.
